Pro Chassis Construction Books

  • Volume 1 covers tube chassis fabrication
  • Documents the process start to finish
  • Begins with a bare chassis table and adds tubes one by one
  • Every tube is covered in sequence as it was installed
  • The finished chassis is ready for body & interior installation
  • Volume 2 starts with the completed tube chassis
  • The carbon fiber body is fitted to the chassis
  • Doors, windows and the front end are installed
  • Wheel tubs, trunk, tunnel, wing and splitter are next
  • The brake and fire supression system are plumbed
  • Finally the scoop is fitted and they body's ready for paint